The Dolores Canyon Solar project, located in Dolores, CO, was developed and constructed by JUWI inc., purchased by Tri-State Generation and Transmission Association (TSGT), and provides power to TSGT. The project will generate enough electricity to power 32,802 homes, and is expected to reach commercial operation in 2025.